An overview of the key aspects of validating a production isolator system is reviewed with an emphasis on relating design documentation to validation plans and protocols.
This workshop thoroughly reviewed the overall design process and equipment qualification methodology for isolator systems utilizing gaseous decontamination methods. Key learning objectives included determining your capacity requirements, developing a validation master plan, facility classification requirements, and qualifying your isolators and related process equipment.